PROJEK-PROJEK YANG TELAH DISIAPKAN TAHUN 2008

 

Bil.

Tajuk

Pelanggan

Jumlah(RM)

Tarikh

Mula

Siap

1

Design and Supervision of Electrical Works for BLT Project: Kompleks Logistik PDRM Pulau Pinang

NRS Asso /PBLT

     180,000.00

10-Nov-06

Ongoing

2

KHTP – Independent Power Utility. Suppy, Installation And Commissioning Of Electrical System And Cabling For KTPC Kulim Perdana Housing  In Kulim Hi-Tech Park

NUR

     285,760.00

02-Jan-08

15-Jul-08

3

Penyenggaraan Pencegahan Pencawang TNB Nibong Tebal

TNB

       63,443.00

08-Jan-08

15-Apr-08

4

Design and Supervision of Mechanical & Electrical Works for PKENPs Project: Taman Sena Indah, Kangar Perlis

NRS Asso /PKENPs

          50,000.00

11-Jan-08

Ongoing

5

PBT – Penyenggaraan Lampu Jalan

Intan Segmen/PBT Hi-Tech

          45,000.00

15-Jan-08

Ongoing

6

Relay testing and calibration for UniKL Kulm

UniKL

            3,300.00

20-Jan-08

20-Jan-08

7

MSVR – Merombak, Menyusun Semula Sesalur Atas Voltan Rendah Di Kg. Ee Guan, Serdang, Bandar Bahru, Kedah Darul Aman.

Panama Elektrik/TNB

          18,868.46

21-Jan-08

Ongoing

8

B/E Untuk Fasa 1 Cadangan Skim Perumahan Di Atas Lot 8,10, 11, 316, 344, 444, 445 dan sebahagian Lot 5 & 6, Mk. Sg. Ular, Daerah Kulim, Kedah Darul Aman

Panama Elektrik/TNB

          17,630.00

21-Feb-08

16-Apr-08

9

Electrical Inspection Works

IWK A Setar

          18,960.00

01-Mac-08

28-Feb-09

10

Cadangan Kerja-kerja Perkhidmatan Penyelenggaraan Infrastruktur Sistem Bekalan Elektrik Selama Dua (2) Tahun Di UiTM Kedah, Kampus Sg. Petani, Kedah Darul Aman.

UiTM

        200,791.00

01-Mac-08

28-Feb-10

11

Electrical Inspection Works – Empangan Beris

JPS Kedah

          19,800.00

01-Mac-08

Ongoing

12

Supply, Delivery and Installation of newly 4 units OCEF relays at BN Shipyard, Lumut, Perak

Boustead Naval Shipyard

          17,000.00

24-Mac-08

15-Apr-08

13

Penyenggaraan Pencegahan Pencawang TNB Pulau Pinang

TNB

        120,000.00

01-Apr-08

31-Dis-09

14

Repair of oil leaks  at neutral bushing, filtration and dehydration 1 unit 15MVA 33/11kV transformer no 1 and functional test for all protection circuit.

Boustead Naval Shipyard

          22,500.00

19-Apr-08

20-Apr-08

15

Kerja-kerja Perkhidmatan Penyelenggaraan Infrastruktur Sistem Bekalan Elektrik Selama Dua (2) Tahun Di UiTM Perak, Kampus Seri Iskandar, Perak Darul Ridzuan.

UiTM

        185,992.00

01-Mei-08

30-Apr-10

16

Replacement of Low Voltage Power Cables for location 17/18, 20, 21/22 and 37 Warehouse

Boustead Naval Shipyard

        500,000.00

15-Mei-08

22-Okt-08

17

Electrical Inspection Works

IWK Taiping

            6,720.00

01-Jun-08

31-Mei-10

18

Tx Oil Sample Analysis

Boustead Naval Shipyard

          15,456.00

01-Jun-08

23-Jun-08

19

Maintenance and Servicing of 11kV and 415V Equipment Including Relay Recalibration

Taigene Metal (M) Sdn Bhd

            4,500.00

01-Jul-08

13-Jul-08

20

Maintenance and Servicing of 11kV and 415V Equipment At MAXIS TOC, Seberang Jaya

EPE Switchgear/ Maxis

          14,450.00

08-Jul-08

09-Jul-08

21

Kerja-kerja Pemeriksaan dan Membuat Ujian Tatahan Kepada Geganti Untuk Loji-loji dan Rumah Pam JBA Negeri Kedah

JBA Negeri Kedah

          57,760.00

14-Jul-08

18-Ogos-08

22

Supervising Electrical Engineer’s Inspection Services, PenangPort Sdn Bhd

NRS Asso /PPSB

        154,800.00

01-Ogos-08

31-Jul-11

23

KHTP – Independent Power Utility Project. 11kV Cable Replacement for CS6-CS7 Circuit in Kulim Hi-Tech Park

NUR

          60,090.00

24-Ogos-08

18-Sept-08

24

End to end test & line stability for current  differential relay 7SD (siemens) – fibre optics

TopRank Corp

            5,000.00

04-Sept-08

05-Sept-08

25

Service Of Work For LV Electrical System Inspection And Rectification Works

RapidKL

          52,500.00

14-Sept-08

10-Okt-08

26

Pre-Commissioning Testing at PPU Bukhari, Alor Setar, Kedah.

MHM

            1,700.00

03-Nov-08

08-Nov-08

27

Testing (VLF Test) of 33/11KV Cable at PPU Bagan Datoh, Perak

MHM

            4,000.00

07-Nov-08

07-Nov-08

28

11KV Switchgear Testing & Commisioning at PPU Jalan Perusahaan Perai, Pulau Pinang.

MHM

          19,400.00

17-Nov-08

30-Nov-08

29

Commisioning test for line protection between PMU Alor Setar (GIS) and PPU Taman Nuri.

Swiss Const.

            4,000.00

22-Nov-08

21-Nov-08

30

33KV Cable VLF Test Between PMU Alor Setar (GIS) and PPU Taman Nuri.

Swiss Const.

            2,800.00

22-Nov-08

21-Nov-08

31

Electrical Inspection Works

SEMASA/ KWSP

            7,200.00

01-Dis-08

31-Dis-09

32

Penyenggaraan Pencegahan Pencawang TNB Bukit Mertajam

TNB

        360,000.00

01-Sept-08

Ongoing

33

Oil Reclaimation for transformers in BN Shipyard

BNS

          68,000.00

17-Nov-08

30-Nov-08

33

Menaiktaraf Papan Suis Utama 415V Bagi Meningkatkan Penggunaan Set Janakuasa Tunggusedia di Empangan Beris, Sik, Kedah Darul Aman

JPS Kedah

          19,000.00

11-Okt-08

17-Dis-08

34

Electrical Inspection Works

Kolej Komuniti Kepala Batas

          10,800.00

01-Nov-08

31-Dis-10